Commissioning - Best Practices During the Construction Phase
Commissioning
Best Practices
•
Staying
abreast of project updates and developing a rapport with all the parties
involved in the project are important aspects of the commissioning process.
•
Interestingly,
there are handful of best practices that the best commissioning management
company in the UK can integrate into each stage of the commissioning process to
make it more effective.
•
Keep
reading to know about such practices that you can use during the important
phase of construction.
Conducting
a Great Initial Meeting
•
When
conducted appropriately, the initial meeting should make the project team feel
quite confident that the commissioning management firm is available at all
times to ensure the project completes successfully.
•
Scheduling
the meeting mindfully. It should not be scheduled too early. Reason being,
contractors may forget about the commissioning process if too much time passes
by.
•
It
may appear obvious, but the initial meeting must include a complete review of
the commissioning authority process.
•
Maintaining
the momentum of the meeting is important. This can be done by visiting the site
soon after the meeting and interacting with contractors while showing interest
in their work to understand the project in a better way through keen
observation.
Completing
Pre-Functional Checklists
•
Instead
of depending on installation contractors, the commissioning authority should
take the responsibility to complete the documentation of pre-functional
checklist.
•
While
acting as the most effective supporter of the project owner, the commission
authority can check appropriate installation early on in order to prevent
systemic problems from occurring in the first place.
Becoming
Part of the Solution
•
Project
teams admire commissioning management companies that work beyond generating
lists of problems. That is to say, the commission authority should put in
efforts to be part of the solution.
•
The
commissioning deficiencies log is certainly a crucial communication tool to
track deficiencies that cannot be fixed immediately. Every deficiency is
assigned to a suitable member of the project team.
•
This
log should define every deficiency with clarity while offering suggestions on
how to resolve the issue.
Customising
Functional Performance Testing
•
After
the approval of submittals, Functional Performance Testing (FPT) documentation
must be completed.
•
The
documentation should describe any particular installation or operational
requirements from the manufacturer, along with test procedures developed
through years of commissioning experience.
•
Specific
control sequences should be used that are developed by the design team to check
the response of equipment to changes in the status, like transition from
heating to cooling or enabling the economizer mode.
To
Conclude
•
The
true value of commissioning is achieved in the design phase – when the impact
is highest and the costs are lowest.
•
As
the project proceeds into the construction phase, avoiding costs becomes
tougher.
•
The
best practices discussed above will help ensure that members of the project
team are well informed, costly equipment failures are prevented and the project
is ready for successful acceptance and testing phases.